We represent a new, luxury building, located in a newly developed area south of Sofias city centre This project has been designed as a mini-complex, where some of the apartments look south over the beautiful Vitosha Mountain and the others look into a private garden with a well secured childrens playground.
The design provides a contemporary living space with thoughtfully designed rooms and living space. The communal areas and the exterior are similarly well designed with special emphasize on security and landscaping
The residents will enjoy a secured and private complex while benefiting from the nearby amenities and services such as a pool, tennis courts and a fitness centre.
In the building there will be 50 comfortable apartments in 5 above-ground levels. 3 separate entrances will ensure the privacy of the residents. All floors are accessible by elevator.
The finishing works of the common parts shall consist floor-granite / granite-porcelain/ ceramics; walls indoor gypsum plaster (stucco), latex; ceilings plain ceilings, latex.
Every apartment shall have laminate parquet and granite-porcelain tiles / ceramics floors. Walls - interior gypsum plaster (stucco), glazed ceramic tiles between lower and upper kitchen, flat entrance door; veneer or laminate, fire-proof, multilateral locking mechanism. The kitchens shall be furnished, without electric devices, and the sanitary premises - fully equipped. The interior doors are veneer or laminate, door lock. Windows PVC joinery; double-glazed glass.
There shall be an electric switches and electric plug sockets; equipped electric switch board; structural cables for telephone two telephone plug sockets structural cables for cable TV, structural cables security system purposes SST.
The underground level contains parking places and storage rooms, accessible through staircases and elevators with direct access to the apartments.
The mentioned price is basic, as the finishing works for each apartment are compulsory and the final value is defining accordingly the chosen materials.
Final stage of construction end of 2007