New, luxury residence, ideally located on a hill overlooking the Vitosha Mountain on one side and the city of Sofia on the other. It boards with area designated and housed by ambassadors and diplomats residing in Sofia. Naturally, the security and safety in the area is tightly kept and the infrastructure and sanitation is well preserved.
All apartments are well designed and will be built with materials of the highest quality.
The building consists 28 apartments and 4 studios over 7 residential levels. All apartments have balconies, many enjoying comfortably large terraces. 3 garden apartments and one roof top duplex.
The building has 2 underground levels, one dedicated solely to secure parking behind electronically operated gates and the second (only half floor) dedicated mainly to storage rooms.
The finishing works of the common parts shall consist floor-granite / granite-porcelain/ ceramics; walls indoor gypsum plaster(stucco), latex; ceilings plain ceilings, latex.
Every apartment shall have laminate parquet and granite-porcelain tiles / ceramics floors. Walls - interior gypsum plaster (stucco), glazed ceramic tiles between lower and upper kitchen, flat entrance door; veneer or laminate, fire-proof, multilateral locking mechanism. The kitchens shall be furnished, without electric devices, and the sanitary premises - fully equipped. The interior doors are veneer or laminate, door lock. Windows PVC joinery; double-glazed glass.
There shall be an electric switches and electric plug sockets; equipped electric switch board; structural cables for telephone two telephone plug sockets structural cables for cable TV, structural cables security system purposes SST.
For its construction shall be used modern technologies and high quality materials, making sure it smoothly blends with its surroundings that brings city style living and design to the comfort and security of Sofia nearby suburbs.
The mentioned price is basic, as the finishing works for each apartment are compulsory and the final value is defining accordingly the chosen materials.
Final stage of construction end of 2007